Damaged PVC Stub-Up: Leaning, Scuffed and Gouged
September 2026, during frame installation. Photo 6 of 8 from my own lot. Resized only; nothing retouched except where the caption says so.
Open full size (1350×1800)
What the photo shows
My project record
- A large-diameter capped PVC pipe rising from the slab, leaning off vertical.
- Black scuff marks and gouges up one side of the pipe.
- Duct tape and green plastic at the base where the pipe passes through the slab.
- Pine straw and concrete dust on the slab; the half-built frame edge in the background.
What it does not prove
Who or what hit the pipe. I contend it happened during L&G’s installation work; the photo shows the result, not the moment.
Where it fits
Around September 4, 2026. In the pre-pour photo P-01, the stub-ups are standing straight. My contract has the customer hold L&G harmless for damage to pipes and lines during construction.